8 Rue Robert-Céard, Geneva: before and after

See the photos showing the transformation of the building at 8 Rue Robert-Céard, carried out by the 3BM3 architecture practice and led by Moser Vernet & Cie.

DSC_0424RR
2597_facade1

Built in the 1970s, the building houses a shop on the ground floor, with offices and flats on the other floors. The refurbishment of the shop and the desire to optimise the building’s energy efficiency prompted the client to consider a major overhaul of the building envelope.

DSC_0430RR
2597_facade2
Immeuble rue Ceard Genève 3bm3
DSC_0451RR
DSC02623RR
2597_entree

Architectural expression has thus undergone a profound change: the project by Atelier d’Architecture 3BM3 has transformed the building from a very closed-off and anonymous structure into a bold and open one.

moser-vernet-cie-geneve-Illustration-exclusive-homme-journal-fauteuil

Are you interested in this article?

Sign up to receive our articles by email

     

    You might also be interested in these articles

    Magazine espaces contemporains - Moser Vernet et Cie SA

    Discover this project by @nsarchitectes

    Find out more

    MVC_JL_PERROT_OEUVRE_2

    Allévenue by Jean-Louis Perrot

    Find out more

    tendance-immobiliere-geneve-deconfinement-covid19-moser-vernet

    A splendid plot of over 7,000 m² for sale

    Find out more